The offshore wind industry in Europe is looking to move further from shore and increase the size of wind parks and wind turbines. As of now marine logistics during the operation and maintenance life cycle phase is, besides wind turbine reliability, the most important limitation for wind turbine service, repair and replacement, and pose a large risk for wind park operators and owners.