Improving Mining Outbound Logistics with Agent-Based Simulation Modeling

Problem:




One of the largest resource companies in the world, with over $80 billion in sales, decided to enter a new market. It was planning to build a new potash mine with 90% of the resources exported. They wanted to design a reliable supply chain, with a high speed of supply replenishing, and the ability to recover from natural disasters and man-made crises benefiting from such volatility. Amalgama and Goldratt companies contracted this project to design the potash mining operations and a full supply chain of outbound logistics.


Before the contractor initiated the project, it was important to understand the bottlenecks of the simulation system, which was built for this project earlier by another company. The customer was able to get some benefits from it, however the model behaved like a black box because it produced numbers without any explanation of what was happening in the supply chain. Simulation modeling was supposed to visualize the supply chain processes and help:

  • Design a supply chain with a high service level and lowest cost and capital investments at the same time.
  • Choose the optimum stock management policy – Push, Hybrid, or Pull.
  • Find storage capacity at mines, ports, and hubs.
  • Determine the number of rail cars needed.


The wrong decisions might lead to a hundred million dollars' profit loss over a 20-year period.


Solution:




To meet the requirements, the model had to:

  • Be easily adjustable with nodes and links, and by editing performance parameters.
  • Include randomness, variability in demand and supply, and disruptions.
  • Capture interdependencies and performance variations from dynamic animation.
  • Present financial and operational performance metrics.
  • Perform a single run experiment, scenario comparison, and sensitivity analysis.


AnyLogic simulation tool fulfilled these requirements. It allowed engineers to create a model of the supply chain, adjustable to any inclusions. AnyLogic modeling clarified the processes inside locations (ports, hubs, etc.), and showcased how modeling process constituents work and interact.


The mining logistics process started at plants and mine storages. When the products were mined and ready to be transferred, a decision was made whether to ship the product to an export channel, or leave it for the domestic market. The products got to a hub or port storage by train, and were then shipped by vessels or transferred by trucks for local distribution.


Mining Supply Chain Simulation Modeling


In the designed agent-based model, sea ports and mines, as well as trucks, trains, and vessels, acted as stand-alone agents, interacting with each other. The model also included different sources of randomness, for example, port strikes, weather delays, disruption at production sites, customer demand variability, etc. The graphs in the model showed output statistics of the supply chain and its components.


Mining Logistics Simulation Model

Mining Agent-Based Simulation Model


While running the model, sensitivity analysis was performed to define the best policy for the supply chain – Push, Hybrid, or Pull. The analysis implied adding rail cars into the system (from 2.5 thousand up to 5.5 thousand rail cars), changing the amount of storage capacity at port and mine (from 150 thousand up to 500 thousand tons), and identifying the service level alteration. The world-class service level was predefined as 98% (green), and lower service levels were marked as red and yellow.


The graph shows that Push scenario did not give any positive results. Hybrid scenario provided the required level of performance, however it was possible to reach it with Pull policy at a combination of 4.5/ 3.5 thousand rail cars with 250/300 kilotons. The system turned out to be very sensitive in terms of storage capacity.

Supply Chain Sensitivity Simulation Analysis


After defining the optimal policy, complexity and volatility factors were added to the model to see how the service level would alter. Push policy was negatively impacted by adding new products, customers, hubs, or ports, whereas with Pull strategy, high service levels were maintained regardless of any factors. Each policy was then tested on how the cost per ton changes when variability increased. Push almost always had the highest cost per ton index. However, the graph showed that as volatility and complexity were added, cost per ton increased with Pull over time.


Mining Simulation Software For Modeling

Mining Simulation Software


The results were then compared according to different parameters (service level, working capital, stock in hub and port, etc.), and the best/worst policies were chosen.


Outcome:




AnyLogic simulation modeling visually represented supply chain processes and proved Pull policy as optimal. This policy provided a higher level of service at the lowest cost per ton, with smaller working capital and capital investment requirements at the same time. It also showed how the additional storage capacity would help. Other Pull policy major benefits were as follows:

  • It could maintain a world class service level.
  • It was more resilient to changes in market demand and product mix.
  • It offered auto-prioritization in case of low stock levels.
  • It maintained a lower level of stock at port, which prevented trains from queuing.

Push policy, applied by the company before, provided poor service level, because it did not consider demand variability. The company used a multiproduct supply chain, and when customers started demanding a product, it might be missing due to lack of free storage space that was filled up with another product. Pull policy algorithm acted differently. It decided when to safely reduce the stock or increase it, depending on the demand, without paying the cost.

The model capabilities included:

  • Sensitivity analysis – showed how sensitive supply chain performance metrics are to the number of rail cars and storage capacity in port.
  • Scenario comparison – tested different stock management policies, and all the financial and operational results.

The latter provided detailed results on various model parameters. For instance, the difference of Delta cost per ton/sold for Push and Pull policies was three dollars a ton. At 13 million tons per annum, it was 39 million dollars of net profit loss because the wrong policy was chosen. In Tons Sold parameter, there was 4.1 million tons difference between Push and Pull policy results, with the same capacities and volatility. Multiplied by $300 per ton, it was 1.2 billion dollars of revenue loss from choosing the wrong policy.


When the analysis was presented to the top executive, it was decided to choose pull strategy for business development.

Project presentation by Dr. Alan Barnard and Dr. Andrey Malykhanov

 

More Case Studies

  • Planung und Optimierung einer hochautomatisierten Produktionslinie
    Centrotherm Photovoltaics AG ist ein weltweit agierender Anbieter von Technologien und Produktionslösungen für die Photovoltaik, Halbleiter und Mikroelektronikindustrie. Das Unternehmen musste die optimal automatisierte Produktionslinie und Werkskonfiguration finden, um Kosten zu minimieren und Durchsatzleistung und Ausfallsicherheit zu maximieren.
  • Simulation eines Tunnelbaus mit Hilfe einer Tunnelbohrmaschine
    Die Kosten des Ausfalls einer Tunnelbohrmaschine für eine Stunde sind üblicherweise hoch und Projektmanager müssen ihr Bestes tun, um unnötige Verzögerungen im Bau zu verhindern. Das Ziel des Simulationsprojektes, welches durch die Ruhr-Universität Bochum in Deutschland durchgeführt wurde, war es, ein Simulationsmodell zu entwickeln, das fähig ist die Engstellen im Tunnelbauprozess zu bestimmen, um finanzielle Verluste zu minimieren.
  • Peitscheneffekt in der Lieferkette von Halbleitern
    Das Supply Chain Management bei Infineon, ein sehr großer Hersteller von Halbleitern, wollte den Peitscheneffekt, auch Bullwhip-Effekt genannt, in ihrem Markt untersuchen, um Ausgaben zu senken und das Marktverhalten besser vorhersagen zu können. Sie haben AnyLogic-Software eingesetzt, um das Modell einer Lieferkette zu entwickeln - vom Rohmaterial bis zum Verkauf.
  • Analyse von Strategien des Ramp-Up-Managements im Flugzeugbau
    Die Airbus-Gruppe ist am EU-Projekt ARUM (Adaptive Production Management) beteiligt, dessen Fokus eine IT-Lösung für die Risikominderung, die Entscheidungsfindung und Planung während der Anlaufphase von neuen Produkten ist. Das Projekt ist hauptsächlich auf die Flugzeug- und Schiffsbauindustrie ausgerichtet. Die Simulation wurde als ein Teil der ARUM-Lösung gewählt, weil die Teilnehmer damit reale Erfahrungen einer Produktionsanlage reproduzieren können.
  • Der GE Produktionsbetrieb nutzt die Anylogic-Software für Unterscheidungsunterstützung in Echtzeit
    2012 eröffnete GE einen neuen Produktionsbetrieb für Batterien und startete gleichzeitig ein innovatives Geschäft im Bereich der Energiespeicherung. Das Global Research Center von GE suchte ein leistungsstarkes und flexibles Tool, um nicht nur den spezifischen Prozess, sondern das Produktionssystem im Gesamten zu analysieren.
  • Kapazitätsanalyse einer Schiffswerft
    Mit der AnyLogic Simulationssoftware als zentrales Element, benutzt NASSCO ein speziell angefertigtes Analysesytem, genannt das Large Scale Computer Simulation Modeling System for Shipbuilding (LSMSe), um hochdetaillierte und genaue Kapazitätsanalysen sowohl für die gegenwärtige Produktion als auch für neue Arbeiten zu erhalten.
  • Produktionsplanung in der Schiffsindustrie
    Die Manager einer der bedeutendsten italienischen Hersteller benötigten einen neuen, intelligenten Ansatz, um den Planungsprozess einfacher zu gestalten. Ziel war es, dem realen Produktionsplaner außergewöhnlich umfangreiche Planungsinformationen zu geben, mit denen dieser einen Plan vor seiner Umsetzung testen und verfeinern kann.
  • Simulation der internen Schienenlogistik für den Hafen von Le Havre
    Der Hafen von Le Havre in Frankreich benötigte Unterstützung für den Bau eines neuen multimodalen Terminals. Kernpunkt der Simulation war es, den Transfer der Container zwischen Schienenzügen / Frachtkähnen und anderen bestehenden Terminals zu fördern, die diese Container zum bzw. vom Seetransport überführen.
  • Optimierung der Französischen Bahn
    Der Betreiber eines Eisenbahnnetzes des Landes wollte wissen, ob der Schienengüterverkehr mit LKW-Transporten konkurrieren kann. Der Transport LKW-Bahn-LKW sollte effektiver werden.
  • Tragfähigkeitsmodell eines Bahnhofs
    Aurizon ist eines von Australiens größten Bahnfrachtunternehmen mit mehr als 700 Lokomotiven und mehr als 16.000 Wagons. Aurizon ist stark im Kohlen-, Eisenerz- und Mineraltransport vertreten. Um die Effizienz der Betriebsabläufe zu erhöhen, hat das Unternehmen entschieden, einen ihrer Bahnhöfe in eine andere Stadt zu verlegen. Dieser Bahnhof war vor allem für die Wagon- und Lokomotiven-Wartung, sowie für die Vorbereitung der Lok zuständig.